PONTE DE PEDRA Hydroelectrical Development consists of usage of Correntes
River, to generate electrical power to serve Central-West Brazil. The
Correntes River is located in the border of Mato Grosso do Sul and Mato
Grosso States in West-Central Brazil, just in the upper border of wild and
swamp area of Pantanal-a very sensitive environmental area.
The hydroelectrical scheme at PONTE DE PEDRA exploit a water head of
246,25 m to generate 176,1MW net power injecting 1152GWh/year to National
Interconnected Grid S/SE/CO.
The power generated at PONTE DE PEDRA is already sold to CEMIG under a PPA
for a period of 20 years.
In the underground powerhouse are installed 3 turbine-generator sets 58,7MW
rated power supplied by GE Hydro INEPAR to CIGLA-SADE Consortium(Impregilo-Skanska)
who is main contractor to the owner PPE-Ponte de Pedra Energética for
construction of power plant and associated 138kV transmission system,
under a BOT
scheme.
Power generated in the powerhouse at elevation EL.149.50 is evacuated from
generators to step up transformers at transformer deck EL.390,00 in the
top of a high shaft by means of 03 sets of Isolated Phase Bus
13,8kV-3000A.
The shaft is 246,24m height and 7,0m in
diameter and is used for main acess to the powerhouse by means of an
elevator and a steel stair. The shaft is used also for ventilation of the
powerhouse and acess route for power and control cables.
The Isolated Phase Bus of the 3 generating units are installed in steel
stair/elevator combined supports specially designed for that purpose.
The Isolated Phase Bus was supplied by PowerBus to IESA-Inepar,
Araraquara, Brazil and was entirelly designed and built in Itajaí, SC,
Brazil.
Powerbus supplied also jobsite supervision during erection and
comissioning.
This project, by his nature,has several technical challenges and Powerbus
adopted advanced engineering techniques including Finite Elements Method (FEM)
to better determine the equipment sizing in order meet customer
specifications regarding losses and guaranteed operating temperatures.
For manufacturing and site erection PowerBus also developed innovative and
creative solutions in order easy transportation to remote jobsite located
1500km away from the factory,by dirt roads, as well specially design
aproach was adopted to reduce labor and optimize field assembling and
welding in the shaft section and at same time acomplish with severe
Quality and Safety standards required by Customer.
|
|